×

P29 Technology • Case Study

For more information please email Paul Rothman or Mark Holdsworth. Thank you.

×

Resource Optimization

Bridging the Critical Supply Deficit in Copper

CiDRA’s novel technology gives a mine a new set of financial and production levers that unlocks throughput and recovery performance with their existing installed plant assets, delivering a new operating point and increasing the value of the mineral resource. This technology provides a low cost solution to ‘turbo-charge’ the performance of the existing plant delivering a boost in productivity for existing resources that enables the industry to meet the copper supply deficit.

CiDRA Minerals Processing
  • About Us
  • Careers
  • We Are CiDRA
  • Macro Statement
  • Advantages
    • P29 White Paper
Select Page

SMARThatch Installation, Operation & Support Manual

by Thomas Vaichus | Mar 20, 2023

21798-01-EN

Recent Posts

  • Stéphane Leblanc Joins CiDRA Board of Directors
  • CiDRA Minerals Processing Inc. Showcases Revolutionary Technology at MINEXCHANGE 2024 SME Annual Conference & Expo
  • CiDRA Awarded a Services Contract for First of a Kind Grind Circuit Rougher at OZ Minerals’ Carrapateena Mine Site
  • Senior Process Engineer
  • Senior Research Chemist

Recent Comments

    • About Us
    • We Are CiDRA
    • Macro Statement
    • Advantages
    • Careers

    CiDRA Corporate Services LLC HQ
    50 Barnes Park North
    Wallingford, CT 06492
    +1.203.265.0035

    CiDRA Minerals Processing - North
    427 Hayden Station Road
    Windsor, CT 06095
    +1.860.602.8200