Resource Optimization

Bridging the Critical Supply Deficit in Copper

The Path to Net Zero

Decreasing the Energy and Water Needs of Mineral Resources

Net Metal Production

Enabling Mine Sites to Deliver a New Optimum in Production

P29 Technology

Step Change Increase in Selectivity and Recovery of Minerals

Applications: Grind Circuit Rougher

Unlock 50% of your Grind Circuit Capacity by Recovering Coarse Minerals from the Circulating Load

Increasing Throughput of the Global Copper Industry by over 40%

Increasing throughput of the global copper industry by over 40% to bridge the decade long 30% supply deficit being forecast

450 mine sites

700 Mine Sites

We are a trusted partner and technology innovator to the global mining industry…….  Just ask one of the 700 mine sites that has our equipment installed

450 mine sites

58 Countries

Our commitment to serving our mining customers in more than 58 countries drives our continual focus on delivering highly innovative process optimization solutions

450 mine sites

40% Throughput Improvement

We have earned the respect and trust of the mining industry with our process optimization solutions which can dramatically improve the throughput of an existing mining operation over 40%

WE ARE CiDRA

  • We are a trusted partner and technology innovator to the global mining industry……. Just ask one of the 700 mine sites that has our equipment installed
  • Our commitment to serving our mining customers in more than 58 countries drives our continual focus on delivering highly innovative process optimization solutions
  • We have earned the respect and trust of the mining industry with our process optimization solutions, but are now rolling out to the mining industry a breakthrough approach to sulphide mineral based, coarse particle recovery that can dramatically improve the throughput of an existing mining operation by over 40%
  • This is particularly important to the global copper industry which is forecasting a 30% structural supply deficit over the next decade with very limited options in place to impact this deficit.

Copper Element Symbol

MACRO STATEMENT

Surge in Copper Demand
The green transition will support a surge in copper demand – Copper demand is estimated to grow nearly 600% to 5.4 Mt by 2030 across Electric Vehicles, wind, solar and battery technology
Under-invested Copper Market
The copper market is unprepared for this critical role – It is estimated that there will be a long -term supply gap of 8.2 Mt by 2030
Mid-decade Sticky Supply
Sticky supply threatens to deplete copper stocks by mid-decade – Copper is so integral to the green transition that supply requirements necessitate a spike in copper prices
Necessary Path
Copper is on a necessary path to $15,000/ton – Copper prices as of February 16th, 2023 ($8950/t) are too low to prevent a near-term risk of inventory depletion
Key for Electrification
Copper is key for electrification – Copper properties make copper the first-best affordable material for the use in cables, batteries, transistors and inverters-all key technologies on the path to net zero
Supply Peaks in 2024
Copper mine supply peaks in 2024 – After a 5-year period of essentially no growth in copper mine supply up to and including 2021. it is expected that mine supply will peak in 2024 at 24Mt before declining in 2026 and through 2030

Advantages of the P29 Solution

Innovative Approach
P29 represents an innovative approach to unlocking the capacity of existing grinding circuits through the application of coarse particle recovery

  • Grinding at a larger particle size can increase the throughput of an existing grinding circuit by over 40%
Dramatically Improves Throughput
P29 dramatically improves the throughput and economics of an existing mine site without the cost of a new grind line
Bolt on Functionality
Bolt on functionality of P29 ensures compatibility with current chemical reagents in an efficient footprint

  • Optimizes the existing flotation process for fine particle recovery and enables coarse particle recovery though the P29 process
Lowers Water Usage
The P29 system lowers water usage significantly as well as enabling power reduction with the added benefit of delivering coarse particles for the construction of tailings dam walls.
Selectively Capture Targeted Minerals
P29 can be applied to all sulphide minerals and is versatile in its ability to selectively capture its targeted minerals. It is a natural complement to an existing mine site.

Upcoming Events

2024 SME MINExchange
2024 SME MINExchange

2024 SME Annual Conference & Expo • MINExchange
February 25-28, 2024
Phoenix, AR
Visit event website for more details
Visit CiDRA at booth #1249

Mining INDABA 2024
2024 INDABA African Mining
2024 INDABA African Mining
February 5-8, 2024
Cape Town, South Africa
Visit event website for more details
Visit CiDRA website for more information
Seminario Minero Cananea 2024
2024 Seminario Minero

2024 Seminario Minero
April 24-26, 2024
Cananea, Mexico
Visit event website for more details
Visit CiDRA at booth #TBD

2024 Euro Mine Expo
2024 Euro Mine Expo
2024 Euro Mine Expo
May 28-30, 2024
Livingstone, Zambi
Visit event website for more details
Visit CiDRA at Booth TBD
2023 Comminution - MEI Conference
2023 APC

2023 APC • 7th Congress
June 22-23, 2023
Lima, Peru
Visit event website for more details
Visit CiDRA at booth TBD

2023 Comminution - MEI Conference
World Mining Conference 2023

26th World Mining Conference 2023
June 26-29, 2023
Brisbane, Australia
Visit event website for more details
Visit CiDRA at booth #131

2023 Comminution - MEI Conference
2023 WEDA

2023 WEDA Dredging Summit & Expo
July 17-20, 2023
Las Vegas, NV
Visit event website for more details
Visit CiDRA at booth #422

2023 Comminution - MEI Conference
2023 PERUMIN

2023 PERUMIN 36 Mining Convention
September 25-29, 2023
Lima, Peru
Visit event website for more details
Visit CiDRA at booth TBD