×

P29 Technology • Case Study

For more information please email Paul Rothman or Mark Holdsworth. Thank you.

×

Resource Optimization

Bridging the Critical Supply Deficit in Copper

CiDRA’s novel technology gives a mine a new set of financial and production levers that unlocks throughput and recovery performance with their existing installed plant assets, delivering a new operating point and increasing the value of the mineral resource. This technology provides a low cost solution to ‘turbo-charge’ the performance of the existing plant delivering a boost in productivity for existing resources that enables the industry to meet the copper supply deficit.

CiDRA Minerals Processing
  • About Us
  • Careers
  • We Are CiDRA
  • Macro Statement
  • Advantages
    • P29 White Paper
Select Page

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Recent Posts

  • Stéphane Leblanc Joins CiDRA Board of Directors
  • CiDRA Minerals Processing Inc. Showcases Revolutionary Technology at MINEXCHANGE 2024 SME Annual Conference & Expo
  • CiDRA Awarded a Services Contract for First of a Kind Grind Circuit Rougher at OZ Minerals’ Carrapateena Mine Site
  • Senior Process Engineer
  • Senior Research Chemist

Recent Comments

    • About Us
    • We Are CiDRA
    • Macro Statement
    • Advantages
    • Careers

    CiDRA Corporate Services LLC HQ
    50 Barnes Park North
    Wallingford, CT 06492
    +1.203.265.0035

    CiDRA Minerals Processing - North
    427 Hayden Station Road
    Windsor, CT 06095
    +1.860.602.8200